Applying for a Building Permit
The International Building Code adopted by the City requires that you get a permit before doing any:
- construction, enlargement, alteration, repair, movement, demolition, or changing the occupancy of any building or structure; and
- installation, enlargement, alteration, repair, removal, conversion, or replacement of any electrical, gas, mechanical, or plumbing system.
This includes tenant improvements to leased space. There are a few exceptions to this rule, which may be found here .
If you’ve never worked with or gotten a building permit before, it’s sometimes challenging to figure out which of the application forms below you might need to use or what regulations apply to your project. If you don’t already know what permit(s) you need, we encourage you to consult with our Permit Counter staff prior to downloading and completing forms. This can help to avoid confusion and wasted time and effort at your end. The Permit Counter is located on the second floor of Lakewood City Hall, located at 6000 Main Street SW, and is open on a first-come, first served basis from 8:30 a.m. to 4:30 p.m., Monday through Friday. (If you are ready to submit your application, we ask that you arrive no later than 4:00 p.m.)
Property owners may perform work on their own property. If a contractor is used, the contractor must have a state contractor's license (and/or appropriate state specialty license) and a City of Lakewood business license. Please keep in mind that work on a project cannot legally begin before a permit is issued. When developing your construction schedule, please consider the time that will be needed to obtain all necessary permits before construction.
Permit fees are based on the value of the work, including labor, materials, and sales tax.
Application Forms
- 2009 Residential Energy Form (pdf 191 kB) (doc 338 kB)
- Affidavit in Lieu of Contractor (pdf 129 kB)
- Building Permit Application (doc 344 kB) (pdf 80 kB)
- Commercial-industrial TI Submittal Packet (doc 714 kB) (pdf 210 kB)
- Demolition Permit Application Submittal Packet (doc 346 kB) (pdf 43 kB)
- Detached Residential Structure Submittal Packet (doc 686 kB) (pdf 163 kB)
- Home Occupation Packet (pdf 78 kB) (doc 370 kB)
- Mechanical Permit Application (doc 243 kB) (pdf 41 kB)
- New Commercial-industrial Building Submittal Packet (doc 981 kB) (pdf 227 kB)
- New Sign Permit Application (pdf 109 kB) (doc 343 kB)
- New Single Family-duplex Packet (doc 854 kB) (pdf 198 kB)
- Plumbing App (pdf 48 kB) (doc 241 kB)
- Preapp Packet (doc 706 kB) (pdf 33 kB)
- Residential Additions-remodel Submittal Packet (doc 693 kB) (pdf 156 kB)
- Revision Submittal (doc 97 kB) (pdf 92 kB)
- Temporary Sign Permit Application (pdf 140 kB) (doc 343 kB)
After your permit has been issued, you may schedule an inspection 24 hours or more in advance of the day you would like the inspection to be performed. Please call the inspection line at (253) 512-2266 and leave your recorded message, providing all the information as directed; or arrange for an inspection online .
City of Lakewood